Control center & detailed planning – flexible control with GNT.


More overview, less downtime – visual production planning with a system.

Your benefits with the GNT control station – flexible planning, visual control, on-time production

Simulation meets reality – detailed planning & control center

The GNT control station is your central solution for graphically supported detailed planning and digital production planning – in real time and fully integrated. With the control station system, you can plan and control resources, orders and machine statuses visually, transparently and flexibly. You not only see what is running, but also what is possible – for resource-saving, on-time and capacity-optimized production.

Integration & system architecture

Fully integrated into your MES
  • Transfer to PDA, MDA and personnel planning
  • Feedback from production
  • Web-based application with user rights

What our customers say about GNT Systems

Detailed planning & resource synchronization – manage orders efficiently and realistically

Visual detailed planning with real-time synchronization of machines, materials and personnel.

Detailed planning on an order basis

  • Display of all production orders in the timeline
  • Scheduling according to production lines, machines and resources

Real-time resource synchronization

  • Display of machine status, material availability & staffing
  • Proposal planning for optimum occupancy

Scenario simulation in detailed planning – react flexibly, decide with foresight

Frequently asked questions
on the topic of control center & detailed planning

What is a control station in production?

A control station is a central control instrument in production that graphically visualizes, monitors and coordinates production processes. It shows current order and machine statuses, enables detailed planning in the timeline and supports prioritization, rescheduling and capacity distribution – in real time.

Yes, the GNT control center can be connected via interfaces to PTR (personnel time recording) and personnel resource planning. This means that shift models, availabilities and personnel capacities can be incorporated directly into production planning and taken into account in allocation – for realistic, feasible detailed schedules.